Departed Chinaman’s Bay @ 0730, wind SW 20 kts. Heading outside Schouten Island with double reefed main and jib – wing & wing. Diverted to Wineglass Bay with a huge vibration in the port rudder, wind was now blowing 30 knots and we dropped the jib.
Dropped the anchor in Wineglass Bay @ 1315 for a late lunch and checked out the rudder problem. A quick alignment check for the rudders, all OK. Found lots of weed around the dagger boards instead which caused the vibration.
Departed Wineglass Bay @ 1550 after final checks for the strait crossing. Wind SW 20 knots changing to S which peaked at 35 knots during the night. Triple Reefed Main only for the rest of the night, very rough with a large swell and breaking crests. Wind gradually easing during the day, 15-20 knots for rest of the trip across. Arrived at Bermagui on Thursday 30th April @ 1200 after a crossing of 44 hours, covering 416 nm’s.
Dropped the anchor in Wineglass Bay @ 1315 for a late lunch and checked out the rudder problem. A quick alignment check for the rudders, all OK. Found lots of weed around the dagger boards instead which caused the vibration.
Departed Wineglass Bay @ 1550 after final checks for the strait crossing. Wind SW 20 knots changing to S which peaked at 35 knots during the night. Triple Reefed Main only for the rest of the night, very rough with a large swell and breaking crests. Wind gradually easing during the day, 15-20 knots for rest of the trip across. Arrived at Bermagui on Thursday 30th April @ 1200 after a crossing of 44 hours, covering 416 nm’s.